Arkema Inc

Parent Companies:
Arkema Delaware Inc
EPA Facility ID:
100000211488
Other ID:
Facility DUNS:
2290773
Parent Company DUNS:
622121697

Location:

Address:
355 Highway 3142
Hahnville, LA 70057
County:
ST. CHARLES
Lat / Long:
29.986, -90.448 (Get map)
Method:
GPS - Unspecified
Description:
Center of Facility
Horizonal accuracy:
24.1 m
Horizontal reference datum:
World Geodetic System of 1984
Source map scale:

Owner/Operator:

Name:
Arkema Inc
Phone:
(610) 878-6500
Address:
900 First Avenue
King of Prussia, PA 19406
Foreign Address:

Person responsible for RMP implementation:

Name:
Maryetta Lewis
Title:
HESQ Leader

Emergency contact:

Name:
Olivier Depauw
Title:
Plant Manager
Phone:
(504) 342-3344
24-hour phone:
(504) 342-3351
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
(504) 342-3351
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
St. Charles Parish LEPC
Full-Time Equivalent Employees:
50
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Aug. 10, 2017
Inspecting Agency:
State environmental agency
Using Predictive Filing:
No

Processes:

Latex
RMP ID:
1000083752
CBI claimed:
No
Program Level:
3
NAICS:
Resin and Synthetic Rubber Manufacturing (32521)
Chemical name
CAS#
Quantity (lbs.)
CBI
Ammonia (conc 20% or greater)
7664-41-7
92,000
No
Acrylonitrile [2-Propenenitrile]
107-13-1
270,440
No
Vinyl acetate monomer [Acetic acid ethenyl ester]
108-05-4
6,480,000
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Maryetta Lewis
Address:
355 Highway 3142 Bldg 5309
Hahnville, LA 70057
Foreign Address:

Phone:
(504) 342-3340

Latest RMP Submission:

Date:
Dec. 13, 2017
Type:
Resubmission
Reason:
Voluntary update (not described by any of the above reasons)
Registered:
Yes
RMP ID:
1000066767

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Latex)
CBI claimed:
No
Percent weight:
100.0
Physical state:
Liquid
Model used:
EPA's RMP*Comp(TM)
Release duration (mins):
10.00
Wind speed (meters per sec):
1.5
Stability class:
F
Topography:
Rural
Passive mitigation
considered:
  • Dikes
not considered:
  • Enclosures
  • Berms
  • Drains
  • Sumps

3. Toxics: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Latex)
CBI claimed:
No
Percent weight:
30.0
Physical state:
Liquid
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Rural
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown
Public OCA Chemical (in Latex)
CBI claimed:
No
Percent weight:
100.0
Physical state:
Liquid
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Rural
Passive mitigation
considered:
  • Dikes
not considered:
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown
Public OCA Chemical (in Latex)
CBI claimed:
No
Percent weight:
100.0
Physical state:
Liquid
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Rural
Passive mitigation
considered:
  • Dikes
not considered:
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown

4. Flammables: Worst-case

None

5. Flammables: Alternative release

None

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

Latex, Resin and Synthetic Rubber Manufacturing (32521)
Prevention Program ID:
1000070612
Safety Review Date
Feb. 16, 2017, since latest RMP submission
PHA Update Date
May 17, 2016, since latest RMP submission
PHA Techniques
  • None
Hazards Identified
  • Toxic release
  • Fire
  • Explosion
  • Runaway reaction
  • Polymerization
  • Overpressurization
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Grounding Equipment
  • Inhibitor Addition
  • Rupture Disks
  • Purge System
Mitigation Systems
  • Sprinkler System
  • Dikes
  • Fire Walls
  • Blast Walls
  • Deluge System
  • Water Curtain
Monitoring Systems
  • Process Area
Changes since PHA
  • Mitigation Systems
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
Nov. 2, 2017, since latest RMP submission
Training Review Date
Dec. 14, 2016, since latest RMP submission
Maintenance Review Date
Oct. 17, 2017, since latest RMP submission
Maintenance Inspection Date
Nov. 8, 2017, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Sept. 25, 2017
Management of Change Review Date
Feb. 6, 2017
Pre-startup Review Date
Oct. 11, 2017
Compliance Audit Date
March 17, 2016
Compliance Audit Change Completion Date
Jan. 31, 2018
Incident Investigation Date
June 19, 2017
Incident Invest. Change Completion Date
July 31, 2017
Participation Plan Review Date
Feb. 6, 2017
Hot Work Review Date
Aug. 19, 2017
Contractor Safety Review Date
Feb. 7, 2017, since latest RMP submission
Contractor Safety Eval. Date
May 15, 2017, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
Nov. 1, 2017
Local Response Agency:
Local Response Agency Phone:
(985) 783-5050
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
Yes
Subject To - CWA:
No
Subject To - RCRA:
Yes
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

Arkema Inc. owns and operates a chemical manufacturing facility located at 355 Hwy 3142, Hahnville, LA 70057. This facility is part of the Arkema Coating Resins (ACR) Business Unit within Arkema Inc., and is commonly referred to as 'SCO Latex'. Operations at SCO Latex produce water based latex emulsion products that are primarily used in coating, sealing and adhesive applications.



SCO Latex strives for excellence in safety and environmental compliance. The SCO Latex facility has a full range of policies and procedures that control the operating discipline in the handling and transfer of chemicals. All chemicals are handled with care of the environment and the persons handling them. As a function of latex emulsion production, the RMP regulated substances handled in the facility are acrylonitrile, ammonia and vinyl acetate monomer.

As part of the ongoing commitment to safety and environmental compliance, the ACR SCO Latex facility stays abreast of OSHA PSM regulations as part of the site's HSE Compliance program. A multi-level spill prevention program remains in force in the facility that includes policies and procedures, operating discipline, auditing, incident reporting and safety level switches. In the past five years the ACR SCO Latex facility has had no (0) release incidents related to the RMP regulated chemicals.



As part of an ongoing emergency response system, the ACR SCO Latex maintains a series of documented emergency response procedures, conducts employee emergency response training and conducts emergency response drills. In addition to policies and training, the site also works closely with the local emergency response organizations and the local emergency planning committee. Through our ongoing implementation of the PSM/RMP program, ACR SCO Latex looks continuously for possible chemical handling system changes to improve safety in our facility.