Garyville, LA SMR

Parent Companies:
Air Products and Chemicals, Inc.
EPA Facility ID:
100000209071
Other ID:
Facility DUNS:
0
Parent Company DUNS:
3001070

Location:

Address:
4663 Airline Highway W.
Garyville, LA 70051
County:
ST. JOHN THE BAPTIST
Lat / Long:
30.063, -90.589 (Get map)
Method:
Interpolation - Digital map source (TIGER)
Description:
Air Monitoring Station
Horizonal accuracy:
10 m
Horizontal reference datum:
World Geodetic System of 1984
Source map scale:

Owner/Operator:

Name:
Air Products and Chemicals
Phone:
(985) 535-8808
Address:
4663 W. Airline Hwy
Garyville, LA 70051
Foreign Address:

Person responsible for RMP implementation:

Name:
Jeff Bellelo
Title:
Area Manager

Emergency contact:

Name:
Engled Bosch
Title:
Site Supervisor
Phone:
(225) 562-3778
24-hour phone:
(786) 282-3808
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
(985) 535-8808
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
St. John The Baptist Parish LE
Full-Time Equivalent Employees:
15
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Jan. 10, 2011
Inspecting Agency:
EPA
Using Predictive Filing:
No

Processes:

Unspecified process
RMP ID:
1000058290
CBI claimed:
No
Program Level:
3
NAICS:
Industrial Gas Manufacturing (32512)
Chemical name
CAS#
Quantity (lbs.)
CBI
Flammable Mixture
00-11-11
67,568
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Matt Hornyak
Address:
1423 Pasadena Freeway
Pasadena, TX 77506
Foreign Address:

Phone:
(713) 920-7250

Latest RMP Submission:

Date:
Sept. 29, 2014
Type:
Resubmission
Reason:
5-year update (40 CFR 68.190(b)(1))
Registered:
Yes
RMP ID:
1000046761

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

None

3. Toxics: Alternative release

None

4. Flammables: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
EPA's OCA Guidance Reference Tables or Equations
Passive mitigation
considered:
  • None
not considered:
  • Blast walls

5. Flammables: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
EPA's OCA Guidance Reference Tables or Equations
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Fire wall
  • Blast walls
  • Enclosures
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Excess flow valve

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

, Industrial Gas Manufacturing (32512)
Prevention Program ID:
1000048518
Safety Review Date
Aug. 21, 2014, since latest RMP submission
PHA Update Date
Aug. 21, 2014, since latest RMP submission
PHA Techniques
  • Checklist
  • HAZOP
Hazards Identified
  • Fire
  • Explosion
  • Runaway reaction
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Flares
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Rupture Disks
  • Excess Flow Device
  • Purge System
Mitigation Systems
  • None
Monitoring Systems
  • Process Area
Changes since PHA
  • None Recommended
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
Sept. 11, 2014, since latest RMP submission
Training Review Date
June 27, 2014, since latest RMP submission
Maintenance Review Date
Sept. 10, 2014, since latest RMP submission
Maintenance Inspection Date
Sept. 3, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Sept. 10, 2014
Management of Change Review Date
May 1, 2009
Pre-startup Review Date
Feb. 14, 2014
Compliance Audit Date
April 19, 2012
Compliance Audit Change Completion Date
Sept. 16, 2012
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
Oct. 1, 2013
Hot Work Review Date
Jan. 31, 2012
Contractor Safety Review Date
April 16, 2010, since latest RMP submission
Contractor Safety Eval. Date
May 27, 2014, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
No
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
No
Plan Review Date:
Response Training Date:
None
Local Response Agency:
Local Response Agency Phone:
(985) 652-2222
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
No
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

Executive Summary



1. Accidental release prevention and emergency response policies:

At this facility, we manufacture gaseous hydrogen. Hydrogen and methane, in the amounts handled by our facility, is

considered hazardous by the EPA. It is our policy to adhere to all applicable Federal and state rules and

regulations. Air Products manages the safety of the regulated processes by means of operating procedures, equipment testing and inspections, safety devices (e.g., alarms, shutdowns, instrumentation, relief devices) inherent in the design of this facility and other controls and systems designed to prevent accidental releases of hazardous chemicals. Safe work practices and training of our personnel supplement the inherent safe design of the plant. Our emergency response program is based upon OSHA's HAZWOPER regulation. The emergency response plan includes procedures for the notification of the Marathon Fire Brigade and other appropriate local responders so that appropriate measures can be taken to control accidental releases. In addition the facility has contracted Industrial Emergency Services (IES) as an Emergency Response Company. This document has been prepared in accordance with the EPA's Risk Management Plan regulation (40 CFR, Part 68). The substances and processes considered during the preparation of this RMP and the scenarios described were selected based on criteria established in the regulation.

2. The stationary source and regulated substances handled:

The primary purpose of this facility is the manufacturing of gaseous hydrogen. Our refinery customer uses the hydrogen. Natural gas is received by our plant via pipeline and used as feedstock. The feedstock is reacted in the reformer furnace. By exposing the feedstock to a catalyst in the presence of heat (approximately 1,600 degrees F.) and steam, a chemical reaction takes place that converts the feedstock into hydrogen, carbon monoxide and carbon dioxide. The carbon monoxide and carbon dioxide are
then

separated from the hydrogen in a Pressure Swing Adsorption (PSA) system. The regulated substance handled at this facility is the flammable gas mixture.

3. The general accidental release prevention program and specific prevention steps:

The facility developed prevention program elements based on the Federal EPA's Accidental Release

Prevention Plan and OSHA's Process Safety Management (PSM) regulation. This facility was designed and constructed to comply with applicable state and industry codes.

4. Five year accident history:

There have been no accidents involving or accidental releases of a flammable mixture that resulted in any deaths, injuries, or significant property damage on site, or known off-site deaths, injuries, evacuations, sheltering in place, property damage, or environmental damage

5. The emergency response program:

The facility's emergency response program is based upon OSHA's HAZWOPER standard. At this site,

employees are trained to recognize emergencies and initiate emergency response from outside agencies. They have been trained to OSHA's First Responder Awareness Level. The employees will receive annual refresher training in their role in the emergency plan. Emergency response activities will be coordinated with Marathon's Fire Brigade.

6. Planned changes to improve safety:

The facility resolves recommendations from PHAs and Incident Investigations, some of which may result in modifications to the plant design and operating procedures.