Napoleonville Storage Facility

Parent Companies:
EnLink Midstream Operating, L.P.
EPA Facility ID:
100000122565
Other ID:
Facility DUNS:
0
Parent Company DUNS:
0

Location:

Address:
1265 Highway 70 South
Belle Rose, LA 70431
County:
ASSUMPTION
Lat / Long:
30.014, -91.137 (Get map)
Method:
Unknown
Description:
Process Unit
Horizonal accuracy:
10 m
Horizontal reference datum:
World Geodetic System of 1984
Source map scale:

Owner/Operator:

Name:
EnLink Processing Services, LLC
Phone:
(214) 953-9500
Address:
1722 Routh St Suite 1300
Dallas, TX 75201
Foreign Address:

Person responsible for RMP implementation:

Name:
Don Nguyen
Title:
PSM Manager

Emergency contact:

Name:
Chad Vaughn
Title:
Plant Manager
Phone:
(225) 692-6979
24-hour phone:
(225) 385-9336
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
(214) 721-9271
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
Assumption Parish LEPC
Full-Time Equivalent Employees:
6
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
Yes
CAA Permit ID#:
002-00002-Z7
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Inspecting Agency:
LDEQ 8/2/2016
Using Predictive Filing:
No

Processes:

Unspecified process
RMP ID:
1000074366
CBI claimed:
No
Program Level:
3
NAICS:
Natural Gas Liquid Extraction (211112)
Chemical name
CAS#
Quantity (lbs.)
CBI
Flammable Mixture
00-11-11
238,347
No
Flammable Mixture
00-11-11
238,347
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Nick Kellam
Address:
1722 Routh St Suite 1300
Dallas, TX 75201
Foreign Address:

Phone:
(469) 644-8662

Latest RMP Submission:

Date:
Aug. 18, 2016
Type:
Resubmission
Reason:
5-year update (40 CFR 68.190(b)(1))
Registered:
Yes
RMP ID:
1000059518

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

None

3. Toxics: Alternative release

None

4. Flammables: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
PHAST
Passive mitigation
considered:
  • None
not considered:
  • Blast walls
Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
EPA's RMP*Comp(TM)
Passive mitigation
considered:
  • None
not considered:
  • Blast walls

5. Flammables: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
PHAST
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Fire wall
  • Blast walls
  • Enclosures
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Excess flow valve

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

, Natural Gas Liquid Extraction (211112)
Prevention Program ID:
1000062471
Safety Review Date
Dec. 15, 2015, since latest RMP submission
PHA Update Date
Dec. 15, 2015, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • None
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Flares
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Inhibitor Addition
  • Rupture Disks
Mitigation Systems
  • Dikes
Monitoring Systems
  • Process Area
  • Perimeter Monitors
Changes since PHA
  • Increased Inventory
  • Process Parameters
  • Process Controls
  • Process Detection
  • Perimeter Monitoring
  • Mitigation Systems
Training Type
  • None
Competency Testing
  • None
Procedure Review Date
July 1, 2016, since latest RMP submission
Training Review Date
June 1, 2015, since latest RMP submission
Maintenance Review Date
Feb. 1, 2016, since latest RMP submission
Maintenance Inspection Date
Feb. 1, 2016, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
April 1, 2016
Management of Change Review Date
Jan. 1, 2016
Pre-startup Review Date
May 2, 2016
Compliance Audit Date
June 10, 2015
Compliance Audit Change Completion Date
Feb. 20, 2016
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
June 1, 2015
Hot Work Review Date
Jan. 1, 2016
Contractor Safety Review Date
May 2, 2016, since latest RMP submission
Contractor Safety Eval. Date
May 2, 2016, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
Feb. 1, 2016
Local Response Agency:
Local Response Agency Phone:
(504) 369-7386
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
Yes
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

EPA RMP Submission, Executive Summary

The Napoleonville (NPVL) Facility consists of a Liquefied Petroleum Gas (LPG) storage facility

that receives butanes and raw make by pipeline, as well as normal butane and refinery grade

butane (RGB) storage at the Belle Rose Truck Station expansion that are loaded from storage

caverns or pipeline. The site consists of product storage equipment. Products are transported

from the facility via pipeline.



Napoleonville Liquid Storage was evaluated to determine if any regulated flammable or toxic

substances exceeded the threshold quantity. The listed flammable substances that are stored

above threshold quantities at Napoleonville Liquid Storage are raw make and butane.

Additionally, normal butane and RGB at the Belle Rose Truck Station are stored above

threshold quantities.



Based on worst-case analysis, the distance to the endpoint encompasses public receptors. The

closest public receptor (Gator Corner Store) is approximately 0.16 miles from the storage facility

in the analysis. In addition, Napoleonville Liquid Storage is subject to OSHA

PSM. Therefore, Napoleonville Liquid Storage is classified as a Program 3 facility. The processes

at the plant are interconnected by piping and fit the EPA's definition of a stationary source in 40

CFR part 68. The facility contains two sources of regulated substances held over their respective

threshold quantities; butane and raw make (equal parts mixture of ethane, propane, butane, and

natural gasoline), and an expansion with two other regulated substances above their respective

threshold quantities, n-butane and RGB.