houstonlogo rjilogo

The Right-to-Know Network

Back to search

Lucas Waste Water Treatment Plant

Parent Companies:
City of Shreveport, Department of Operational Serv
EPA Facility ID:
100000114896
Other ID:
Facility DUNS:
0
Parent Company DUNS:
137710372

Location:

Address:
11301 East Kings Highway
Shreveport, LA 71115
County:
CADDO
Lat / Long:
32.400, -93.692 (Get map)
Method:
Interpolation - Map
Description:
Center of Facility
Horizonal accuracy:
243.8 m
Horizontal reference datum:
North American Datum of 1927
Source map scale:
24000

Owner/Operator:

Name:
Department of Operational Services
Phone:
(318) 673-7660
Address:
505 Travis Street
Shreveport, LA 71130
Foreign Address:

Person responsible for RMP implementation:

Name:
Jo Loston
Title:
Superintendent

Emergency contact:

Name:
Jo Loston
Title:
Superintendent
Phone:
(318) 673-7690
24-hour phone:
(318) 673-7600
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
Full-Time Equivalent Employees:
20
Covered by OSHA PSM:
No
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Inspecting Agency:
Never had one
Using Predictive Filing:
No

Processes:

Unspecified process
RMP ID:
58185
CBI claimed:
No
Program Level:
2
NAICS:
Sewage Treatment Facilities (22132)
Chemical name
CAS#
Quantity (lbs.)
CBI
Chlorine
7782-50-5
36,000
No
Public OCA Chemical
0
No
Unspecified process
RMP ID:
58186
CBI claimed:
No
Program Level:
2
NAICS:
Sewage Treatment Facilities (22132)
Chemical name
CAS#
Quantity (lbs.)
CBI
Sulfur dioxide (anhydrous)
7446-09-5
36,000
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Wes Wyche
Address:
505 Travis Street
Shreveport, LA 71130
Foreign Address:

Phone:
(318) 673-7660

Latest RMP Submission:

Date:
Sept. 20, 2004
Type:
Correction of existing RMP
Reason:
Minor administrative change
Registered:
No
RMP ID:
40495

Deregistration:

Date:
Effective Date:
Reason:
Source no longer uses any regulated substance
Other Reason:

2. Toxics: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Percent weight:
Physical state:
Gas
Model used:
EPA's RMP*Comp(TM)
Release duration (mins):
10.00
Wind speed (meters per sec):
1.5
Stability class:
F
Topography:
Urban
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps

3. Toxics: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Percent weight:
Physical state:
Gas
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Urban
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown
Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Percent weight:
Physical state:
Gas
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Urban
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown

4. Flammables: Worst-case

None

5. Flammables: Alternative release

None

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

No Prevention Program level 3

8. Prevention Program level 2

, Sewage Treatment Facilities (22132)
Prevention Program ID:
22059
Safety Review Date
July 19, 2002, since latest RMP submission
PHA Update Date
, since latest RMP submission
Safety Regulations
  • ASTM Standards
  • ANSI Standards
  • ASME Standards
Hazards Identified
  • Toxic Release
  • Equipment failure
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Manual Shutoffs
  • Automatic Shutoffs
Mitigation Systems
  • Neutralization
Monitoring Systems
  • Process Area
Changes since PHA
  • None
Training Type
  • Classroom
  • On the Job
Competency Testing
  • Demonstration
  • Observation
Procedure Review Date
July 19, 2002, since latest RMP submission
Training Review Date
July 19, 2002, since latest RMP submission
Maintenance Review Date
July 19, 2002, since latest RMP submission
Maintenance Inspection Date
June 15, 2004, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Management of Change Review Date
Pre-startup Review Date
Compliance Audit Date
July 19, 2002
Compliance Audit Change Completion Date
None
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
Hot Work Review Date
Contractor Safety Review Date
, since latest RMP submission
Contractor Safety Eval. Date
, since latest RMP submission
, Sewage Treatment Facilities (22132)
Prevention Program ID:
22060
Safety Review Date
July 19, 2002, since latest RMP submission
PHA Update Date
, since latest RMP submission
Safety Regulations
  • ASTM Standards
  • ANSI Standards
  • ASME Standards
Hazards Identified
  • Toxic Release
  • Equipment failure
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Manual Shutoffs
  • Automatic Shutoffs
Mitigation Systems
  • Neutralization
Monitoring Systems
  • Process Area
Changes since PHA
  • None
Training Type
  • Classroom
  • On the Job
Competency Testing
  • Demonstration
  • Observation
Procedure Review Date
July 19, 2002, since latest RMP submission
Training Review Date
July 19, 2002, since latest RMP submission
Maintenance Review Date
July 19, 2002, since latest RMP submission
Maintenance Inspection Date
June 15, 2002, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Management of Change Review Date
Pre-startup Review Date
Compliance Audit Date
July 19, 2002
Compliance Audit Change Completion Date
None
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
Hot Work Review Date
Contractor Safety Review Date
, since latest RMP submission
Contractor Safety Eval. Date
, since latest RMP submission

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
March 6, 2003
Local Response Agency:
Local Response Agency Phone:
(318) 425-5351
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
No
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

The Lucas WWTP utilizes chlorine gas as a disinfectant and sulfur dioxide as a dechlorinant prior to discharging plant effluent to the Red River. For the past five year period, there have been no major accidental releases of either chemical at the plant. Current safety, training, operation, and maintenance practices at the Lucas WWTP follow the guidelines set forth in the Risk Management Program. Procedures documenting compliance with the legislation provided in 40 CFR 68.48 through 60 are provided in a series of three-ring binders located at the plant. The Safety Specialist for the City's Department of Operational Services will be responsible for performing the compliance audit as required by the rule. Currently, the plant is undergoing a major capital renovation, one aspect of which is the conversion of the disinfection process from chlorination to ultraviolet light. UV equipment has been installed and should go on line on a permanent basis later this year,and plans are for the phasing out of using chlorine.