Balchem Corporation - St. Gabriel

Parent Companies:
Balchem Corporation
EPA Facility ID:
100000086104
Other ID:
70776BPRDC3830H
Facility DUNS:
0
Parent Company DUNS:
41992728

Location:

Address:
3830 Hwy. 30
St. Gabriel, LA 70776
County:
IBERVILLE
Lat / Long:
30.249, -91.089 (Get map)
Method:
Interpolation - Digital map source (TIGER)
Description:
Process Unit Area Centroid
Horizonal accuracy:
15 m
Horizontal reference datum:
North American Datum of 1983
Source map scale:

Owner/Operator:

Name:
Balchem Corporation - St. Gabriel
Phone:
(225) 255-4889
Address:
3830 Hwy. 30
St. Gabriel, LA 70776
Foreign Address:

Person responsible for RMP implementation:

Name:
Jed Bishop
Title:
Plant Manager

Emergency contact:

Name:
Jed Bishop
Title:
Plant Manager
Phone:
(225) 255-4889
24-hour phone:
(845) 467-9604
Ext or PIN:
2302

Other contacts:

Facility (or company) email:
Facility phone:
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
Iberville Parish LEPC
Full-Time Equivalent Employees:
16
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Sept. 4, 2013
Inspecting Agency:
State occupational safety agency
Using Predictive Filing:
No

Processes:

Choline Manufacturing
RMP ID:
1000051554
CBI claimed:
No
Program Level:
3
NAICS:
Other Animal Food Manufacturing (311119)
Chemical name
CAS#
Quantity (lbs.)
CBI
Ethylene oxide [Oxirane]
75-21-8
1,200,000
No
Trimethylamine [Methanamine, N,N-dimethyl-]
75-50-3
1,600,000
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Jed Bishop
Address:
3830 Hwy. 30
St. Gabriel, LA 70776
Foreign Address:

Phone:
(225) 255-4889

Latest RMP Submission:

Date:
May 8, 2014
Type:
Resubmission
Reason:
5-year update (40 CFR 68.190(b)(1))
Registered:
Yes
RMP ID:
1000041852

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Choline Manufacturing)
CBI claimed:
No
Percent weight:
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Release duration (mins):
10.00
Wind speed (meters per sec):
1.5
Stability class:
F
Topography:
Rural
Passive mitigation
considered:
  • Dikes
  • Drains
  • Sumps
  • Dilution pond
not considered:
  • Enclosures
  • Berms

3. Toxics: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Choline Manufacturing)
CBI claimed:
No
Percent weight:
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Rural
Passive mitigation
considered:
  • Dikes
  • Drains
  • Sumps
  • Dilution Pond
not considered:
  • Enclosures
  • Berms
Active mitigation
considered:
  • Sprinkler systems
  • Deluge systems
  • Emergency shutdown
  • Dilution Pond
not considered:
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers

4. Flammables: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Choline Manufacturing)
CBI claimed:
No
Model used:
EPA's RMP*Comp(TM)
Passive mitigation
considered:
  • None
not considered:
  • Blast walls

5. Flammables: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Choline Manufacturing)
CBI claimed:
No
Model used:
EPA's RMP*Comp(TM)
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Fire wall
  • Blast walls
  • Enclosures
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Excess flow valve

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

Choline Manufacturing, Other Animal Food Manufacturing (311119)
Prevention Program ID:
1000043714
Safety Review Date
Oct. 3, 2013, since latest RMP submission
PHA Update Date
Aug. 21, 2013, since latest RMP submission
PHA Techniques
  • What if
Hazards Identified
  • Toxic release
  • Fire
  • Explosion
  • Runaway reaction
  • Polymerization
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Rupture Disks
  • Excess Flow Device
  • Quench System
  • Purge System
Mitigation Systems
  • Sprinkler System
  • Dikes
  • Deluge System
Monitoring Systems
  • Process Area
  • Perimeter Monitors
Changes since PHA
  • Process Parameters
  • Process Controls
  • Perimeter Monitoring
Training Type
  • Classrom
  • On the Job
Competency Testing
  • Written Test
  • Demonstration
  • Observation
Procedure Review Date
Oct. 31, 2013, since latest RMP submission
Training Review Date
April 7, 2014, since latest RMP submission
Maintenance Review Date
Feb. 18, 2014, since latest RMP submission
Maintenance Inspection Date
May 1, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
April 8, 2010
Management of Change Review Date
Feb. 18, 2014
Pre-startup Review Date
Dec. 13, 2011
Compliance Audit Date
Feb. 18, 2014
Compliance Audit Change Completion Date
Feb. 18, 2014
Incident Investigation Date
April 23, 2014
Incident Invest. Change Completion Date
April 23, 2014
Participation Plan Review Date
Jan. 23, 2014
Hot Work Review Date
Feb. 18, 2014
Contractor Safety Review Date
Feb. 18, 2014, since latest RMP submission
Contractor Safety Eval. Date
Jan. 14, 2014, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
April 3, 2014
Local Response Agency:
Local Response Agency Phone:
(225) 687-5140
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
Yes
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

EPA Facilty ID 1000 0008 6104



Founded in January 1967, Balchem supplies the animal nutrition market with specialty products derived from our encapsulation and chelation technologies, in addition to basic choline chloride. Balchem is also one of the largest manufacturers and marketers of choline chloride, an essential nutrient for animal health, predominantly in the poultry and swine industries. Choline plays a vital role in the metabolism of fat and the building and maintaining of cell structures. Choline deficiency can result in, among other symptoms, reduced growth and perosis in chicks, fatty liver, kidney necrosis and general poor condition in baby pigs.



At the Saint Gabriel plant, regulated substances ethylene oxide and trimethylamine are used to produce the non-hazardous aqueous choline chloride product. There have been no accidental releases in at least the last five years. Accidental release prevention is accomplished through the RMP / PSM elements with emphasis on Management of Change, Process Hazard Analysis, Pre-startup Safety Review, Mechanical Integrity and Employee Training. The production process is designed to go to a safe mode in the event of power loss or other disruption. The site is always occupied with production areas monitored with cameras, chemical sensors, and fire detection.



Should a chemical leak occur, water deluge can be applied and a contract emergency response team is available to respond as described in the sites Emergency Action Plan. To improve future safety, the site has initiated a Hazard Identification and Risk Assessment Program (HIRA), an Observation Program, additional PM's such as annual UPS PM's, LA Work Force Commission SHARP Program with Audits, and an Emergency Info and Crisis Box. Improvements are also planned for Training System by converting to a Computer Based Program with premade classes, tests, and tracking, and management systems are being improved to track compliance due dates and preventative mai
ntenance requirements.