houstonlogo rjilogo

The Right-to-Know Network

Back to search

Occidental Chemical CorporationTaft Plant

Parent Companies:
Occidental Chemical Holding Corporation
EPA Facility ID:
100000081911
Other ID:
70057CCDNTLAHWY
Facility DUNS:
39056619
Parent Company DUNS:
144374907

Location:

Address:
266 Highway 3142
Hahnville, LA 70057
County:
ST. CHARLES
Lat / Long:
29.985, -90.458 (Get map)
Method:
Interpolation - Satellite
Description:
Center of Facility
Horizonal accuracy:
40 m
Horizontal reference datum:
North American Datum of 1983
Source map scale:

Owner/Operator:

Name:
Occidental Chemical Corporation
Phone:
(985) 783-7200
Address:
266 Highway 3142
Hahnville, LA 70057 -2608
Foreign Address:

Person responsible for RMP implementation:

Name:
Lynette Currier
Title:
HES Engineer

Emergency contact:

Name:
Chris Keran
Title:
HES Manager
Phone:
(985) 783-7393
24-hour phone:
(985) 783-7200
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
(985) 783-7200
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
St. Charles Parish LEPC
Full-Time Equivalent Employees:
204
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
Yes
CAA Permit ID#:
2520-00007-V6
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
May 22, 2014
Inspecting Agency:
OSHA
Using Predictive Filing:
No

Processes:

Chlorine
RMP ID:
1000053943
CBI claimed:
No
Program Level:
3
NAICS:
Other Basic Inorganic Chemical Manufacturing (32518)
Chemical name
CAS#
Quantity (lbs.)
CBI
Chlorine
7782-50-5
25,000,000
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Lynette Currier
Address:
266 Highway 3142
Hahnville, LA 70057 -2608
Foreign Address:

Phone:
(985) 783-7388

Latest RMP Submission:

Date:
June 13, 2014
Type:
Resubmission
Reason:
5-year update (40 CFR 68.190(b)(1))
Registered:
Yes
RMP ID:
1000043671

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Chlorine)
CBI claimed:
No
Percent weight:
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Release duration (mins):
10.00
Wind speed (meters per sec):
1.5
Stability class:
F
Topography:
Rural
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps

3. Toxics: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Chlorine)
CBI claimed:
No
Percent weight:
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Rural
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Enclosures
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • Emergency shutdown
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers

4. Flammables: Worst-case

None

5. Flammables: Alternative release

None

6. Five-year accident history

Oct. 2, 2017 at 10:35
ID:
1000053477
NAICS:
Other Basic Inorganic Chemical Manufacturing (32518)
Duration:
1 minutes
Chemicals involved:
  • Chlorine
Release events:
Gas release
Weather conditions at time of event
Wind speed:
8.30000019 miles/h E
Temperature:
80.00 ℉
Atmospheric stability:
C
Precipitation present:
No
Unknown weather conditions:
No
On-site impacts
Deaths of employees or contractors:
0
Deaths of public responders:
0
Deaths of public:
0
Injuries of employees or contractors:
1
Injuries of public responders:
0
Injuries of public:
0
Property damage:
$0
Known off-site impacts
Deaths:
0
Hospitalizations:
0
Medicals treatments:
0
Evacuated:
0
Sheltered-in-place:
0
Property damage:
$0
Environmental damage:
Initiating event:
Human Error
Contributing factors:
  • Human error
Off-site responders notified:
Notified Only
Changes introduced as a result of the accident:
  • Revised training
  • Issued a Lessons Learned to communicate issue to entire OxyChem corporation

7. Prevention: Program level 3

Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045951
Safety Review Date
May 14, 2014, since latest RMP submission
PHA Update Date
June 24, 2010, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Rupture Disks
  • Purge System
Mitigation Systems
  • None
Monitoring Systems
  • None
Changes since PHA
  • None
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
July 25, 2013, since latest RMP submission
Training Review Date
July 25, 2013, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
Aug. 14, 2013, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
July 25, 2013
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
July 25, 2013
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045941
Safety Review Date
April 28, 2014, since latest RMP submission
PHA Update Date
June 21, 2012, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Fire
  • Explosion
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Rupture Disks
  • Purge System
Mitigation Systems
  • Fire Walls
  • Neutralization
Monitoring Systems
  • Process Area
  • Perimeter Monitors
Changes since PHA
  • Process Parameters
  • Process Controls
  • Process Detection
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
May 6, 2014, since latest RMP submission
Training Review Date
May 6, 2014, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
June 2, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
April 28, 2014
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
April 28, 2014
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
Oct. 2, 2017
Incident Invest. Change Completion Date
Feb. 6, 2018
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045942
Safety Review Date
May 14, 2014, since latest RMP submission
PHA Update Date
Nov. 19, 2009, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Rupture Disks
  • Purge System
Mitigation Systems
  • None
Monitoring Systems
  • None
Changes since PHA
  • None
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
Dec. 31, 2013, since latest RMP submission
Training Review Date
Dec. 31, 2013, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
Aug. 14, 2013, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Dec. 31, 2013
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
Dec. 31, 2013
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045943
Safety Review Date
March 19, 2014, since latest RMP submission
PHA Update Date
Feb. 11, 2014, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Fire
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Grounding Equipment
  • Rupture Disks
  • Excess Flow Device
  • Purge System
Mitigation Systems
  • Dikes
  • Neutralization
Monitoring Systems
  • None
Changes since PHA
  • None
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
March 19, 2014, since latest RMP submission
Training Review Date
March 19, 2014, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
Dec. 2, 2013, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
March 19, 2014
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
March 19, 2014
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045944
Safety Review Date
Dec. 16, 2013, since latest RMP submission
PHA Update Date
April 3, 2013, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Fire
  • Explosion
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Rupture Disks
  • Purge System
Mitigation Systems
  • Fire Walls
  • Neutralization
Monitoring Systems
  • Process Area
  • Perimeter Monitors
Changes since PHA
  • Reduced Inventory
  • Process Parameters
  • Process Controls
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
May 22, 2014, since latest RMP submission
Training Review Date
April 30, 2014, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
Feb. 6, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Dec. 16, 2013
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
March 20, 2010
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045947
Safety Review Date
March 17, 2014, since latest RMP submission
PHA Update Date
Dec. 2, 2010, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Fire
  • Explosion
  • Overpressurization
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Vents
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Keyed Bypass
  • Emergency Air Supply
  • Emergency Power
  • Backup Pump
  • Excess Flow Device
  • Purge System
Mitigation Systems
  • Fire Walls
  • Neutralization
Monitoring Systems
  • Process Area
  • Perimeter Monitors
Changes since PHA
  • Process Controls
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
May 6, 2014, since latest RMP submission
Training Review Date
May 13, 2014, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
May 16, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
March 17, 2014
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
March 17, 2014
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission
Chlorine, Other Basic Inorganic Chemical Manufacturing (32518)
Prevention Program ID:
1000045954
Safety Review Date
Oct. 27, 2010, since latest RMP submission
PHA Update Date
March 16, 2010, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Toxic release
  • Overpressurization
  • Corrosion
  • Contamination
  • Equipment failure
  • Floods
  • Hurricanes
Process Controls
  • Relief Valves
  • Manual Shutoffs
  • Alarms
  • Rupture Disks
Mitigation Systems
  • None
Monitoring Systems
  • None
Changes since PHA
  • None
Training Type
  • None
Competency Testing
  • Written Test
  • Oral Test
  • Demonstration
  • Observation
Procedure Review Date
May 15, 2014, since latest RMP submission
Training Review Date
Oct. 27, 2010, since latest RMP submission
Maintenance Review Date
Jan. 14, 2014, since latest RMP submission
Maintenance Inspection Date
April 27, 2012, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
None
Management of Change Review Date
March 10, 2010
Pre-startup Review Date
None
Compliance Audit Date
Oct. 19, 2012
Compliance Audit Change Completion Date
Aug. 26, 2013
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
March 10, 2011
Hot Work Review Date
March 1, 2009
Contractor Safety Review Date
June 2, 2011, since latest RMP submission
Contractor Safety Eval. Date
Nov. 20, 2013, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
June 10, 2014
Local Response Agency:
Local Response Agency Phone:
(985) 783-5050
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
Yes
Subject To - CWA:
No
Subject To - RCRA:
Yes
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

2014 EXECUTIVE SUMMARY





Occidental Chemical Corporation (OxyChem), whose parent company is Occidental Chemical Holding Corporation, is owner and operator of a chlor-alkali manufacturing facility in Hahnville, LA (also referred to as Taft, LA). The facility produces chlorine, potassium hydroxide, sodium hydroxide, hydrogen, and cogenerates electricity for in-plant use and sale. The OxyChem Taft facility employs 204 full-time employees.



Accidental Release Prevention and Emergency Response Policies at the Stationary Source (40 CFR 68.155(a))



OxyChem is committed to operating the Taft Plant in a manner that is safe for its workers, the public, and the environment. Part of this commitment includes systems for the safe operation of processes to prevent accidental releases of hazardous substances. This program conforms to the requirements of the Environmental Protection Agency regulation 40 CFR Part 68, Accidental Release Prevention Requirement Risk Management Programs (the RMP rule), and the OSHA regulation 29 CFR 1910.119, Process Safety Management. This document is intended to satisfy the RMP plan requirement of the RMP rule and to provide the public with a description of the risk management program at the OxyChem Taft facility.



The Stationary Source and Regulated Substances Handled (40 CFR 68.155(b))



The OxyChem Taft facility consists of several chemical production units that are wholly owned and operated by OxyChem. The facility handles one substance regulated under the Risk Management Plan (RMP): Chlorine (CAS Number 7782-50-5).



The General Accidental Release Prevention Program and the Specific Prevention Steps (40 CFR 68.155(d))



The OxyChem Taft facility's prevention program has been prepared so that it conforms to both OSHA Process Safety Management and the EPA Risk Management Plan regulations. The site's prevention program is documented, routinely reviewed, updated as necessary, and addresses several elements including:



? Process
Safety Information

? Process Hazard Analysis

? Operating Procedures

? Training

? Mechanical Integrity

? Management of Change

? Pre-Startup Review

? Compliance Audits

? Incident Investigation

? Employee Participation

? Key Procedures

? Contractors



Five-year Accident History (40 CFR 68.155(e))



The OxyChem Taft facility has not experienced any incident which meets the criteria in 40 CFR 68.42(a) since the last RMP submittal or within the last five years.



Emergency Response Program (40 CFR 68.155(f))



The OxyChem Taft facility has established a written emergency response plan and maintains an emergency response team trained in these emergency response procedures. All plant personnel are trained in evacuation procedures and in-plant drills are conducted periodically. The drills are used to gauge the response time of the Emergency Response Team, to test the plant employee accountability program, and to activate the plant's Emergency Command Center. In addition, the OxyChem Taft facility has developed a Special Situations Plan which is a program designed for responding to emergencies that may impact areas beyond the immediate plant boundaries. This plan is a supplement of and complement to the Emergency Response Plan. The Special Situation Plan links the local response to the OxyChem Corporate Emergency Response Center located in Dallas, Texas.



The facility is a member of the St. Charles Parish Local Emergency Planning Committee (LEPC) and the St. Charles Parish Industrial Mutual Aid Association, which both include industrial and public entities.



Planned Changes to Improve Safety (40 CFR 68.155(g))



The OxyChem Taft facility continually works to improve safety through annual reviews of our plant procedures and process safety information, investigations of near misses and incidents, engagement of site employees on matters of safety and environmental, planned area safety inspections, key procedure audits, job observations, and job task anal
yses. Additionally, internal cross-functional teams conduct compliance audits in the areas of safety, process safety management, and security on a routine basis.





Certification Statement



To the best of the undersigned's knowledge, information, and belief formed after reasonable inquiry, the information submitted is true, accurate, and complete.







Provided through EPA RMP*eSubmit Rick Ritter

-------------------------------------------------- ----------------------------------------------------

Signature Print Name









Plant Manager June 13, 2014

-------------------------------------------------- ----------------------------------------------------