houstonlogo rjilogo

The Right-to-Know Network

Back to search

AEROPRES CORPORATION - COTTON VALLEY, LA

Parent Companies:
AEROPRES CORPORATION
EPA Facility ID:
100000061924
Other ID:
Facility DUNS:
62922133
Parent Company DUNS:
0

Location:

Address:
165 MARATHON TANK ROAD
COTTON VALLEY, LA 71018
County:
WEBSTER
Lat / Long:
32.796, -93.407 (Get map)
Method:
GPS Code Measurements (Psuedo Range) Precise Positioning Service
Description:
Facility Centroid
Horizonal accuracy:
25 m
Horizontal reference datum:
North American Datum of 1983
Source map scale:

Owner/Operator:

Name:
AEROPRES CORPORATION
Phone:
(318) 221-6282
Address:
P O BOX 78588
SHREVEPORT, LA 71137 -8588
Foreign Address:

Person responsible for RMP implementation:

Name:
DAVID WHITLOW
Title:
DIRECTOR OF SAFETY AND TRAINING

Emergency contact:

Name:
DAVID WHITLOW
Title:
DIRECTOR OF SAFETY AND TRAINING
Phone:
(318) 371-6406
24-hour phone:
(800) 424-9300
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
(318) 221-6282
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
Webster Parish LEPC
Full-Time Equivalent Employees:
2
Covered by OSHA PSM:
Yes
EPCRA section 302:
Yes
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Oct. 20, 2014
Inspecting Agency:
OSHA
Using Predictive Filing:
No

Processes:

Unspecified process
RMP ID:
1000059072
CBI claimed:
No
Program Level:
3
NAICS:
Petroleum Bulk Stations and Terminals (42471)
Chemical name
CAS#
Quantity (lbs.)
CBI
Isobutane [Propane, 2-methyl]
75-28-5
784,930
No
Butane
106-97-8
810,390
No
Propane
74-98-6
1,421,280
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Sarah Boudreaux
Address:
301 Main Street
Suite 900
Baton Rouge, LA 70825
Foreign Address:

Phone:
(225) 346-4003

Latest RMP Submission:

Date:
Nov. 4, 2014
Type:
Resubmission
Reason:
Voluntary update (not described by any of the above reasons)
Registered:
Yes
RMP ID:
1000047339

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

None

3. Toxics: Alternative release

None

4. Flammables: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
EPA's RMP*Comp(TM)
Passive mitigation
considered:
  • None
not considered:
  • Blast walls

5. Flammables: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Unspecified process)
CBI claimed:
No
Model used:
EPA's RMP*Comp(TM)
Passive mitigation
considered:
  • None
not considered:
  • Dikes
  • Fire wall
  • Blast walls
  • Enclosures
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

, Petroleum Bulk Stations and Terminals (42471)
Prevention Program ID:
1000049173
Safety Review Date
Jan. 17, 2017, since latest RMP submission
PHA Update Date
Sept. 18, 2014, since latest RMP submission
PHA Techniques
  • HAZOP
Hazards Identified
  • Fire
  • Overfilling
  • Tornado
Process Controls
  • Relief Valves
  • Check Valves
  • Manual Shutoffs
  • Automatic Shutoffs
  • Alarms
  • Excess Flow Device
Mitigation Systems
  • None
Monitoring Systems
  • None
Changes since PHA
  • None Recommended
Training Type
  • Classrom
  • On the Job
Competency Testing
  • Written Test
  • Demonstration
Procedure Review Date
Jan. 17, 2017, since latest RMP submission
Training Review Date
April 12, 2017, since latest RMP submission
Maintenance Review Date
Jan. 17, 2017, since latest RMP submission
Maintenance Inspection Date
Oct. 10, 2017, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Feb. 19, 2014
Management of Change Review Date
Jan. 17, 2017
Pre-startup Review Date
Feb. 25, 2013
Compliance Audit Date
March 8, 2017
Compliance Audit Change Completion Date
April 11, 2017
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
Jan. 17, 2017
Hot Work Review Date
Jan. 17, 2017
Contractor Safety Review Date
Jan. 17, 2017, since latest RMP submission
Contractor Safety Eval. Date
April 5, 2017, since latest RMP submission

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
July 13, 2017
Local Response Agency:
Local Response Agency Phone:
(318) 377-8222
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
No
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

AEROPRES CORPORATION EXECUTIVE SUMMARY



1. Accidental Release Prevention and Emergency Response Policies:

This facility handles Liquefied Petroleum Gases (propane, isobutane and normal butane). These are flammable gases, so it is necessary to follow safety precautions during handling to prevent human exposure and reduce health threats to our workers and the nearby community. Aeropres Corporation will strictly adhere to all Federal, State and Local rules and regulations.



Safety depends on:

(a) The manner in which we handle these products;

(b) The safety devices inherent in the design of the facility;

(c) Operating and maintenance procedures, and

(d) Employee training.



Our emergency response program details employee responsibilities, actions and includes procedures for notification of the local fire authority and the LEPC to notify potentially affected neighbors.



2. The Stationary Source and Regulated Substances handled:

The primary purpose of this facility is to ship Liquefied Petroleum Gases to our customers via truck and rail. Access to the facility is restricted to authorized facility employees, authorized management personnel and authorized contractors.



3. The General Accidental Release Prevention Program and the Specific Prevention Stops:

This facility complies with all Federal, State and Local rules and regulations. The facility was designed and constructed in accordance with NFPA-58 and ASME codes and regulations. All employees are thoroughly trained on the characteristics and handling of propane.



4. Five-Year Accident History:

There have been no accidents at this facility.



5. The Emergency Response Program:

A detailed emergency response program has been developed and sent to the Webster Parish LEPC.



6. Planned Changes to Improve Safety:

There are no plans for changes at this time.