North Wastewater Treatment Plant

Parent Companies:
City of Baton Rouge - East Baton Rouge Parish
EPA Facility ID:
100000043669
Other ID:
4843
Facility DUNS:
0
Parent Company DUNS:
71948301

Location:

Address:
50 Woodpecker Street
Baton Rouge, LA 70807
County:
EAST BATON ROUGE
Lat / Long:
30.534, -91.204 (Get map)
Method:
Interpolation - Photo
Description:
Center of Facility
Horizonal accuracy:
25 m
Horizontal reference datum:
North American Datum of 1983
Source map scale:
24000

Owner/Operator:

Name:
City of Baton Rouge - EBR Parish
Phone:
(225) 389-3240
Address:
2443 River Road
Baton Rouge, LA 70802 -8074
Foreign Address:

Person responsible for RMP implementation:

Name:
Walter Brock
Title:
NWWTP Supervisor

Emergency contact:

Name:
Ms. Cheryl Berry, P. E.
Title:
Special Projects Engineer
Phone:
(225) 389-3240
24-hour phone:
(225) 389-5582
Ext or PIN:

Other contacts:

Facility (or company) email:
Facility phone:
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
East Baton Rouge LEPC
Full-Time Equivalent Employees:
28
Covered by OSHA PSM:
No
EPCRA section 302:
No
CAA Title Air Operating Permit:
No
CAA Permit ID#:
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Inspecting Agency:
Never had one
Using Predictive Filing:
No

Processes:

Sewage Treatment
RMP ID:
1000050766
CBI claimed:
No
Program Level:
2
NAICS:
Sewage Treatment Facilities (22132)
Chemical name
CAS#
Quantity (lbs.)
CBI
Chlorine
7782-50-5
8,960
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Victor J. Sanchez
Address:
7389 florida Blvd.
Suite 300
Baton Rouge, LA 70806
Foreign Address:

Phone:
(225) 922-5787

Latest RMP Submission:

Date:
April 25, 2014
Type:
Resubmission
Reason:
Revised PHA / Hazard Review due to process change (40 CFR 68.190(b)(5))
Registered:
Yes
RMP ID:
1000041272

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Sewage Treatment)
CBI claimed:
No
Percent weight:
100.0
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Release duration (mins):
10.00
Wind speed (meters per sec):
1.5
Stability class:
F
Topography:
Urban
Passive mitigation
considered:
  • Enclosures
not considered:
  • Dikes
  • Berms
  • Drains
  • Sumps

3. Toxics: Alternative release

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in Sewage Treatment)
CBI claimed:
No
Percent weight:
100.0
Physical state:
Gas liquified by pressure
Model used:
EPA's RMP*Comp(TM)
Wind speed (meters per sec):
3.00
Stability class:
D
Topography:
Urban
Passive mitigation
considered:
  • Enclosures
not considered:
  • Dikes
  • Berms
  • Drains
  • Sumps
Active mitigation
considered:
  • None
not considered:
  • Sprinkler systems
  • Deluge systems
  • Water curtain
  • Neutralization
  • Excess flow valve
  • Flares
  • Scrubbers
  • Emergency shutdown

4. Flammables: Worst-case

None

5. Flammables: Alternative release

None

6. Five-year accident history

No Registered Accidents

7. Prevention: Program level 3

No Prevention Program level 3

8. Prevention Program level 2

Sewage Treatment, Sewage Treatment Facilities (22132)
Prevention Program ID:
1000033502
Safety Review Date
Dec. 28, 2011, since latest RMP submission
PHA Update Date
, since latest RMP submission
Safety Regulations
  • None
Hazards Identified
  • Toxic Release
  • Overpressurization
  • Corrosion
  • Overfilling
  • Contamination
  • Equipment failure
  • Cooling loss
  • Floods
  • Hurricanes
Process Controls
  • Relief Valves
  • Check Valves
  • Scrubbers
  • Manual Shutoffs
  • Automatic Shutoffs
  • Interlocks
  • Alarms
  • Emergency Power
  • Rupture Disks
  • Excess Flow Device
Mitigation Systems
  • Dikes
  • Enclosure
  • Neutralization
Monitoring Systems
  • None
Changes since PHA
  • None
Training Type
  • Classroom
  • On the Job
Competency Testing
  • Demonstration
  • Observation
Procedure Review Date
April 10, 2012, since latest RMP submission
Training Review Date
Feb. 3, 2014, since latest RMP submission
Maintenance Review Date
Feb. 4, 2013, since latest RMP submission
Maintenance Inspection Date
April 23, 2014, since latest RMP submission
Equipment Tested
Yes
Management of Change Most Recent Date
Management of Change Review Date
Pre-startup Review Date
Compliance Audit Date
July 11, 2012
Compliance Audit Change Completion Date
None
Incident Investigation Date
None
Incident Invest. Change Completion Date
None
Participation Plan Review Date
Hot Work Review Date
Contractor Safety Review Date
, since latest RMP submission
Contractor Safety Eval. Date
, since latest RMP submission

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
Yes
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
Yes
Plan Review Date:
Response Training Date:
May 14, 2008
Local Response Agency:
Local Response Agency Phone:
(225) 389-4617
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
No
Subject To - CWA:
No
Subject To - RCRA:
Yes
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary


EXECUTIVE SUMMARY
City of Baton Rouge
North Wastewater Treatment Plant

LADEQ Facility Number 4843

USEPA Facility Identifier No. 1000 0004 3669

ACCIDENTAL RELEASE PREVENTION AND RESPONSE POLICIES

The City of Baton Rouge continues its commitment to maintaining full compliance with all federal, state and local regulations. Pursuant to this commitment, the City makes every effort to operate the wastewater treatment facilities in a safe manner, in accordance with all applicable rules and regulations and according to established good engineering and management principles.

The Baton Rouge North Wastewater Treatment Plant (NWWTP) was designed by qualified and experienced engineers and all operating personnel received the necessary training for the safe operation of the plant.

DESCRIPTION OF THE STATIONARY SOURCE AND REGULATED SUBSTANCES.

The NWWTP receives domestic wastewater from the north side of the City's urban perimeter including the Southern University campus, and provides secondary treatment to this wastewater. Before being discharged into the Mississippi River, the treated effluent is disinfected with chlorine. The use of chlorine micals makes the NWWTP subject to the provisions and requirements of Section 112(r) of the Clean Air Act.

Chlorine. The NWWTP has two 5,000-gallon storage tanks (nominal size) to satisfy the chlorine needs of the wastewater disinfection process. Each tank's working capacity is limited, by means of administrative controls, to a maximum of approximately 4,000 gallons, or no more than 50,000 lb. of liquid chlorine. This chemical is delivered on the plant site by dedicated tanker trucks operated by the chlorine supplier. All of the chlorine storage and handling facilities are enclosed inside a steel-frame and concrete building.

Sulfur Dioxide. The NWWTP no longer uses sulfur dioxide. By closely monitoring the chlorination system and the chlorine dosage, the plant was able to reduce the residual chlorine in the treated effl
uent to a sufficiently low level so that it was no longer necessary to treat the effluent with sulfur dioxide. As a result, the dechlorination system was removed from service and the NWWTP no longer maintains any sulfur dioxide inventory on site.

HAZARD ASSESSMENT RESULTS

The requirements of 40 CFR Part 68 includes, among other items, the development of a Worst-Case Scenario (WCS) and an Alternative Release Scenario (ARS) for the possible release of significant quantities of the regulated toxic substance (chlorine). Originally, these requirements also called for the Executive Summary (ES) to include a discussion of the WSC and ARS for each toxic chemical.

Per the above, the ES of the original RMP submitted to the USEPA in 1999 presented and discussed these scenarios and the hypothetical offsite consequences in some detail. Considering that the operation of the chlorination system has not undergone any changes that would affect the scenarios or their underlying assumptions, these scenarios are still valid. However, they will not be discussed further here. In accordance with the 2004 revisions to 40 CFR Part 68 (69 FR 18819-18837, April 9, 2004), a discussion of the WCS's and ARS's is no longer required for inclusion in the ES.

The WCS and ARS for sulfur dioxide no longer apply, since this chemical is no longer present in the process.


PREVENTION PROGRAM

1.0 Safety Information

The North Wastewater Treatment plant of the city of Baton Rouge keeps on site the necessary documents related to the operation and maintenance of the plant in a safe manner. Documentation kept on site provides information regarding the chemical properties and chemical hazards associated with the regulated chemicals (not only chlorine but sodium hydroxide solution - caustic - as well, even though this is not an RMP-regulated chemical); operating limits for all key process parameters; record of the current inventory of these chemicals; and data on equipment design and specifications.


These documents include, but are not limited to the following:

* Copies of current Material Safety Data Sheets (MSDS's) for the chemicals involved
* Vendor's Operation and Maintenance (O&M) manuals for each major component of the chlorination system.
* A complete set of construction drawings and specifications
* A copy of the plant's Emergency Response Plan
* Copies of Shop Drawings and assembly instructions for all major components
* Copies of the Operator's daily log sheets are kept on file. They show material inventories and a record of the shipments of chemicals delivered on site.

The above records are updated as applicable and necessary.

2.0 Hazard Review

A detailed review of the hazards (Process Hazard Assessment, or PHA) associated with the operation of the chlorination system at the NWWTP was just performed within the last few days. The Process Hazard and Operability (HAZOP) review technique was used to identify any hazards and ensure that the necessary controls are in place to manage such hazards. The same HAZOP technique was used in the two previous PHA's, which were performed in 1999 and 2004, respectively.

A team of individuals representing the operations, maintenance, safety, engineering and management departments conducted the HAZOP review and the report that will present and discuss the "Action Items (AI's)" is currently being prepared. Upon completion, this report will be submitted to management for resolution. The corrective action(s) identified for each action item and their proposed disposition (if known), will be discussed in said report.

3.0 Operating Procedures

The NWWTP keeps on site copies of all operating and maintenance procedures that were prepared and submitted to the city by the plant design firm. These procedures address not only normal plant operations but other operating modes such as start-up, normal shut-down, emergency shut-downs, start-up following emergency shut-downs, etc. These procedures also address the remov
al of individual components from the process for inspection and/or maintenance and they discuss the consequences of deviations from the normal operating conditions and the steps to be followed to correct such deviations.

The plant's operating and maintenance procedures are reviewed and updated any time that the process undergoes a significant modification or improvement.

4.0 Training

All of the employees involved in the operation of the chlorination system at the NWWTP underwent initial class-room and hands-on training provided by the design consulting firm. As a part of this training, the employees were given written tests to verify their understanding of the process, the operating conditions, the hazards inherent in the materials being handled and the appropriate responses to alarm conditions and emergencies.

Any time that the process undergoes modifications, changes or improvements, all operators affected by such changes will be provided with the necessary training. In addition, periodic refresher training sessions are held with the participation of all operating and maintenance personnel.

5.0 Maintenance

The NWWTP has in place procedures for the periodic inspection and maintenance of the major components of the chlorination system. The operator performs daily rounds, during which he/she visually inspects all process equipment, instruments and piping and also verifies that the system is operating according to design. The operator will enter his/her comments and observations on the daily log, when and as applicable. Any condition that requires the maintenance department's attention will be submitted to the maintenance supervisor, via a work order request.

All members of the maintenance department staff have undergone training and have hands-on experience in the routine repair and maintenance of process equipment. In addition, specialized equipment such as the chlorinators and control valves are maintained by contract personnel who have experience wi
th this particular type of equipment.


6.0 Compliance Audits

The NWWTP has in place compliance safety audit procedures that call for periodic audits to be performed on the plant's Risk Management Program (RMP) at least every three years. These audits determine how effectively the policies and procedures of the RMP have been implemented. The audit findings are submitted to management for resolution and corrective action as necessary and applicable. Documentation of the audits, findings and resolutions are maintained as part of the prevention program.

The last compliance audit was performed in September of 2006. The audit team included members of the operation, maintenance and management staffs of the wastewater treatment department.

7.0 Incident Investigation

The NWWTP has established procedures to promptly investigate all incidents which result, or could reasonably have resulted, in a significant release of the regulated chemical or which could cause personnel injuries and/or significant property damage. The objectives of such investigations are:

* to establish the facts relating to the incident,
* to determine the factors causing or contributing, directly or indirectly, to the incident and
* to define what corrective actions, if any, are necessary to prevent such incidents from occurring in the future.

The incident investigation team includes members of the staff who are familiar with the process involved in the incident and also includes personnel from the operations, maintenance and management departments.

The investigating team submits its findings and recommendations to plant management for resolution. Corrective actions taken in response to the investigation report are tracked until completed. The final resolution of each finding or recommendation is documented and the investigation results are reviewed with all employees, including contractors, who could be affected by said findings. Incident investigation reports will be kept on file for a m
inimum of 5 years.


5-YEAR ACCIDENT HISTORY

The Chlorine storage and supply facilities at the North Wastewater Treatment Plant have not had any accidental releases of chlorine as described in 40 CFR A?68.42(a), in the past five years.

EMERGENCY RESPONSE PROGRAM

The North WWTP has in place a written Emergency Preparedness and Response Plan for the Chlorine System. Major sections of the Plan are as follows:
* Description of the uses of Chlorine within the plant
* Physical Properties of Chlorine.
* Safety measures that must be taken before working in a Chlorine environment
* Description of monitoring, warning and alarm systems in place at the Chlorine building
* Description of Leak-containing features of the chlorine storage systems
* Description of safety features and measures provided at the chlorine facilities.
* Accessibility restrictions in the chlorine area
* Personnel responsibilities during a chlorine emergency, including local and evacuation alarms.
* List of emergency call numbers to be contacted (local agencies and public)
* Communications with the media and with the public
* Emergencies requiring public action
* Emergency medical treatments
* Closure of emergency condition
* Plant evacuation checklist
* Chlorine system design specification summary

The final version of the Emergency Preparedness and Response Plan was issued in 1997, at approximately the time that the chlorine and sulfur dioxide systems were installed. This plan was revised and updated in March, 2001.

At the State of Louisiana Department of Environmental Quality's (LDEQ's) request, the full text of the emergency response plan was submitted in 2001 as part of a few minor corrections made to the RMP at that time. There have not been any significant changes made to this plan since. The emergency response plan is periodically reviewed and verified for completeness and correctness.

Emergency preparedness and response drills are held periodically with participation of personnel from all
three of Baton Rouge's wastewater treatment plants. These drills also involve the participation of and are executed under the guidance of the Baton Rouge HazMat team and the Baton Rouge Fire Department.

PLANNED CHANGES TO IMPROVE SAFETY

As a result of some of the findings of previous PHA's, the NWWTP has switched the chlorination system from liquid to vapor feed and has also eliminated the use of sulfur dioxide. These changes have virtually eliminated all pressurized liquid chemical lines from the system (with the sole exception of the liquid chlorine unloading line, which is full of liquid chlorine only while a chlorine truckload is being unloaded into the storage tank), as well as allowed the removal of the entire sulfur dioxide system from the process.

There are no other safety-related changes system anticipated for the chlorination at the NWWTP in the near future.

Page 1 of 6