Enterprise Tebone Fractionation Plant

Parent Companies:
Enterprise Gas Processings LLC
EPA Facility ID:
100000000189
Other ID:
Facility DUNS:
0
Parent Company DUNS:
48210686

Location:

Address:
10324 Highway 75
Geismar, LA 70734
County:
ASCENSION
Lat / Long:
30.219, -91.033 (Get map)
Method:
GPS - Unspecified
Description:
Administrative Building
Horizonal accuracy:
50 m
Horizontal reference datum:
World Geodetic System of 1984
Source map scale:

Owner/Operator:

Name:
Enterprise Products Operating LLC.
Phone:
(713) 381-6500
Address:
P. O. Box 4324
Houston, TX 77210 -4324
Foreign Address:

Person responsible for RMP implementation:

Name:
Douglas J. D'Aquila
Title:
Staff Engineer - Safety / PSM

Emergency contact:

Name:
Mark Dicky
Title:
Plant Manager
Phone:
(225) 675-2510
24-hour phone:
(225) 405-7439
Ext or PIN:
108

Other contacts:

Facility (or company) email:
Facility phone:
Facility (or company) URL:

Safety:

Local Emergency Planning Committee:
Ascension Parish LEPC
Full-Time Equivalent Employees:
16
Covered by OSHA PSM:
Yes
EPCRA section 302:
No
CAA Title Air Operating Permit:
Yes
CAA Permit ID#:
0180-00032-V7
OSHA Star/Merit Ranking
No
Last Safety Inspection Date:
Sept. 10, 2013
Inspecting Agency:
EPA
Using Predictive Filing:
No

Processes:

NGL Fractionation
RMP ID:
1000044705
CBI claimed:
No
Program Level:
1
NAICS:
Natural Gas Liquid Extraction (211112)
Chemical name
CAS#
Quantity (lbs.)
CBI
Ethyl mercaptan [Ethanethiol]
75-08-1
15,000
No
Flammable Mixture
00-11-11
430,000
No
Flammable Mixture
00-11-11
62,000
No
Flammable Mixture
00-11-11
74,000
No
Flammable Mixture
00-11-11
68,000
No
Flammable Mixture
00-11-11
5,900,000
No
Flammable Mixture
00-11-11
31,000
No
Flammable Mixture
00-11-11
96,000
No
Flammable Mixture
00-11-11
10,000,000
No
Flammable Mixture
00-11-11
3,400,000
No
Flammable Mixture
00-11-11
3,000,000
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No
Public OCA Chemical
0
No

RMP Preparer:

Name:
Address:

,
Foreign Address:

Phone:

Latest RMP Submission:

Date:
Nov. 11, 2013
Type:
Resubmission
Reason:
Change in program level of covered process (40 CFR 68.190(b)(7))
Registered:
Yes
RMP ID:
1000036477

Deregistration:

Date:
Effective Date:
Reason:
Other Reason:

2. Toxics: Worst-case

None

3. Toxics: Alternative release

None

4. Flammables: Worst-case

Some Risk Management Plan information is not provided in the available RMP data. You need to make an appointment at an EPA Reading Room In order to get access to details from the Off-Site Consequence Analysis (OCA) such as:

Instructions on how to make an EPA appointment can be found here.

Public OCA Chemical (in NGL Fractionation)
CBI claimed:
No
Model used:
Baker-Strehlow-Tang
Passive mitigation
considered:
  • None
not considered:
  • Blast walls

5. Flammables: Alternative release

None

6. Five-year accident history

Aug. 6, 2016 at 07:20
ID:
1000047779
NAICS:
Natural Gas Liquid Extraction (211112)
Duration:
4 hours and 45 minutes
Chemicals involved:
  • Isobutane [Propane, 2-methyl]
Release events:
Gas release
Weather conditions at time of event
Wind speed:
7.0 miles/h NW
Temperature:
77.00 ℉
Atmospheric stability:
D
Precipitation present:
No
Unknown weather conditions:
No
On-site impacts
Deaths of employees or contractors:
0
Deaths of public responders:
0
Deaths of public:
0
Injuries of employees or contractors:
1
Injuries of public responders:
0
Injuries of public:
0
Property damage:
$0
Known off-site impacts
Deaths:
0
Hospitalizations:
0
Medicals treatments:
0
Evacuated:
0
Sheltered-in-place:
0
Property damage:
$0
Environmental damage:
Initiating event:
Equipment Failure
Contributing factors:
  • Equipment failure
Off-site responders notified:
No, not notified
Changes introduced as a result of the accident:
  • Improved/upgraded equipment
  • Revised operating procedures
  • Additional PPE Requirements

7. Prevention: Program level 3

No Prevention Program level 3

8. Prevention Program level 2

No Prevention Program level 2

9. Emergency response

Facility In Community Plan:
Yes
Facility Own Response Plan:
No
Specific Facility Response Plan:
No
Inform. Procedures in Response Plan:
No
Emergency Care in Response Plan:
No
Plan Review Date:
Response Training Date:
None
Local Response Agency:
Local Response Agency Phone:
(225) 644-5307
Subject To - OSHA EAP:
No
Subject To - OSHA HAZWOPER:
Yes
Subject To - CWA:
No
Subject To - RCRA:
No
Subject To - OPA:
No
Subject To - State EPCRA:
Yes
Subject To - Other:

Executive Summary

Tebone Fractionation Plant

Enterprise Products Operating LLC.

Executive Summary

Risk Management Plan

EPA Identifier: 1000 0000 0189





Accidental Release Prevention and Response



The Tebone Fractionation Plant has a long-standing commitment to worker and public safety. This commitment is demonstrated by the resources invested in accident prevention, such as training personnel and considering safety in the design, installation, operation and maintenance of the facility's processes. It is the practice of Enterprise Products Operating LLC (Enterprise) to implement reasonable controls to prevent foreseeable releases of substances. However, if a release does occur, trained personnel will respond to, control and contain the release.



Description of the Stationary Source and Regulated Substances



The Tebone Fractionator located in Ascension Parish, Louisiana is owned by Enterprise Gas Processing LLC and is operated by Enterprise Products Operating LLC.



The Tebone Fractionator receives mixed natural gas liquids (raw make) from the Enterprise North Terrebonne Gas Plant. This raw make is fed to the plant fractionation process comprised of a feed system, Deethanizer, Depropanizer, Debutanizer, Butane Splitter and Tank Storage. In addition, there is a Refrigeration system that is used on the Deethanizer for ethane/propane vapor condensing. The finished natural gas liquids products are shipped out via pipeline, transport trucks or rail cars.



The Tebone Fractionator was evaluated to determine if any regulated flammable or toxic substances exceeded the threshold quantity. Enterprise identified the regulated substances and quantities kept on site based on process knowledge.



Toxics



No toxic materials to report.



Flammables



Listed flammable substances which are stored above the threshold quantities at the Tebone Fractionator are raw make, propane, isobutane, normal butane, natural gasoline and ethyl mercaptan. Ethyl mercaptan is stored at the p
lant for use as an LPG odorant. The actual amount of ethyl mercaptan in storage is usually kept at a minimum unless a favorable market price results in extra purchase. The Plant is subject to the Occupational Safety and Health Administration (OSHA) Process Safety Management (PSM) Standard and is classified as a Program Level 1 site under the EPA RMP regulation.



Offsite Consequence Analysis Results



The offsite consequence analysis will not be reflected in the executive summary but rather is reflected in the data components. There are flammable substances on site and no toxic substances above the threshold quantity.



General Accident Release Prevention Program



The following is a summary of the accident prevention program in place at the Tebone Fractionation Plant. The processes at the plant are regulated by the Environmental Protection Agency (EPA) Risk Management Program (RMP) regulation (Program 1), and are also subject to the OSHA's PSM Standard. This summary addresses each of the PSM program elements and describes the management system in place to implement the accident prevention program which is required only by the facility OSHA PSM regulation coverage.



Employee Participation



Enterprise strongly promotes employee involvement in safety issues through existing programs. These programs include regularly scheduled safety meeting, tail-gate safety meetings, hazard communications, a "near-miss" reporting system and special training programs such as emergency response training, first aid training, etc.



Enterprise actively seeks employee involvement in the development and conduct of all accident prevention activities through the appropriate existing safety programs. Employees are encouraged to discuss accident prevention with their supervisors and to bring any questions, comments or suggestions forward for open discussion.



Process Safety Information



Enterprise keeps a variety of technical documents that are used to help maintain a saf
e operating process. These documents address chemical properties and associated hazards, limits for key process parameters, specific chemicals inventories and equipment design basis/configuration information. Chemical specific information, including exposure hazards and emergency response/ exposure treatment considerations is provided in material safety data sheets (SDS).



Enterprise also maintains numerous technical documents that provide information about the design and construction of process equipment. This information includes materials of construction, design pressure ratings, temperature ratings and electrical rating of equipment.



Process Hazard Analysis (PHA)



Enterprise primarily uses the hazard and operability (HAZOP) and Checklist method analysis technique to perform these evaluations. The analyses are conducted using a team of Enterprise staff which has operating and maintenance experience as well as engineering expertise. This team identifies and evaluates hazards of the process as well as accident prevention and mitigation measures, and the team makes recommendations for additional prevention and/or mitigation measures when the team believes such measures are necessary.



The PHA team findings are forwarded to local and corporate management for resolution. Implementation of mitigation options in response to PHA findings is based on a relative risk ranking assigned by the PHA team. This ranking helps ensure that potential accident scenarios assigned the highest risk receive immediate attention. All approved mitigation options in response to PHA team findings are tracked until they are completed. The final resolution of each finding is documented and retained.



As part of Enterprise Process Hazard Analysis program, the facility will periodically update and revalidate the hazard analysis results.



Operating Procedures



The Tebone Fractionation Plant maintains written procedures that address various modes of process operations
such as; (1) start-up, (2) normal operations, (3) temporary operations, (4) emergency shutdown, (5) normal shutdown and (6) initial startup of a new process. These procedures provide guidance for experienced operators and also provide the basis for training new operators. Operating procedures include applicable safety precautions that must be taken in the operation of the facility. The procedures are periodically reviewed and annually certified as current and accurate. The review and certification process involves both operators and technical staff.



Training



In addition to training on operating procedures, the Tebone Fractionation Plant has a comprehensive training program for all employees involved in operating the process. New employees receive basic training in gas plant operations and safe work practices. All operators receive refresher training on the operating procedures at least every three years to ensure that their skills and knowledge are maintained at an acceptable level.



Contractors



The Tebone Fractionation Plant uses contractors during periods of increased maintenance or construction activities. Because some contractors work on or near process equipment, the plant has procedures in place to ensure that contractors (1) perform their work in a safe manner, (2) have appropriate knowledge and skills, (3) are aware of the hazards of their workplace, (4) understand what they should do in the event of an emergency, (5) understand and follow site specific safety rules and (6) inform plant personnel of any hazards that they find while performing their work. This is accomplished by providing contractors with an orientation session that covers (1) a process overview, (2) information about the safety and health hazards, (3) emergency response plan requirements and (4) safe work practices prior to beginning their work. In addition, Enterprise evaluates contractor safety programs and performance during the contractor selection process. Enterpr
ise personnel periodically monitor contractor performance to ensure that contractors are fulfilling their safety obligations.



Pre-Startup Safety Review (PSSR)



The Tebone Fractionation Plant conducts a PSSR prior to the startup of all new facilities or any modification that requires a change in process safety information. The purpose of the PSSR is to ensure that safety features, procedures, personnel and equipment are appropriately prepared for startup prior to placing the equipment into service.



Mechanical Integrity



The Tebone Fractionation Plant has well established practices and procedures for maintaining process equipment. The basic aspects of this program include (1) training, (2) developing written procedures, (3) performing inspections and tests, (4) correcting equipment deficiencies, when identified and (5) applying quality assurance measures. In combination, these activities form a system that maintains the mechanical integrity of the process.



Safe Work Practices



The Tebone Fractionation Plant has safe work practices in place to help ensure worker and process safety. Examples of these include: (1) control of the entry/presence/exit of support personnel, (2) a lockout/tagout procedure to ensure isolation of energy sources for equipment undergoing maintenance, (3) a procedure for safe removal of hazardous substances before process piping and equipment is opened, (4) a permit and procedure to control spark-producing activities (i.e. hot work) and (5) a permit and procedure to ensure that adequate precautions are in place before entry into a confined space. These procedures, along with training of affected personnel, form a system to help ensure that operations and maintenance activities are performed safely



Management of Change



The Tebone Fractionation Plant uses Enterprise software-based change approval system to manage change to all covered processes. This system requires that changes to items such as process equipment, techno
logy, procedures and other facility changes be properly reviewed and authorized before being implemented to ensure that the safety of the facility is not compromised by the change. Operating and maintenance personnel are provided any necessary training on any changes as part of the change management process.



Incident Investigation



The Tebone Fractionation Plant promptly investigates all incidents that resulted in or reasonably could have resulted in, a fire/explosion, major property damage, environmental loss, or personal injury. The investigation team documents its findings, develops recommendation(s) to prevent a reoccurrence and forwards these results to the business management team for resolution.



Compliance Audits



To help ensure that the accident prevention program is functioning properly, Enterprise periodically conducts an audit of the program to determine whether the procedures and practices required by the accident prevention program are being implemented. Compliance audits are conducted at least every three years. Both hourly and staff personnel participate as audit team members. The audit team develops findings that are forwarded to operations or facility management for resolution. The final resolution of each finding is documented, and the two most recent audit reports are retained.



Chemical Specific Prevention Steps



The processes at the Tebone Fractionation Plant have hazards that must be managed to ensure continued safe operation. The following is a description of existing safety features applicable to prevention of accidental releases of regulated substances in the facility.



Universal Prevention Activities



The accident prevention program summarized previously is applied to all RMP covered processes at the Tebone Fractionation Plant. Collectively, these prevention program activities help prevent potential accident scenarios that could be caused by equipment failures and human errors.



Specialized Safety Features



The
Tebone Fractionation Plant has safety features on many units to help contain/control a release, to quickly detect a release and reduce the consequence of a release. The following types of safety features are used in the covered processes:





Release Detection



* Hydrocarbon (hazardous gas) detectors and alarms

* Fire detectors on gas compression equipment

* Plant video surveillance system



Release Containment and Control



* Process relief valves that discharge to a flare to capture and incinerate episodic releases

* Valves to permit isolation of the process (manual or automated).

* Automatic shutdown systems for specific process parameters (e.g., high pressure).

* Secondary containment (curbs and dikes) to contain any release of liquid chemicals

* Redundant equipment and instrumentation where advisable

* Dual mechanical seals with seal failure alarms installed on hydrocarbon liquid pumps.

* Atmospheric relief devices



Release Mitigation



* Hand-held and wheeled cart fire extinguishers

* Personnel trained in emergency response and procedures.

* Personnel protective equipment (e.g., chemical protective clothing, self-contained breathing apparatus, etc.)



Five Year Accident History



Over the past five years there have been no large or small releases which resulted in any injuries, property damage or offsite consequences.



Emergency Procedures Information



The Tebone Fractionation Plant maintains a written emergency procedure, which is in place to protect worker and public safety as well as the environment. The procedures are for the possibility of a fire or explosion if a flammable substance is accidentally released. The procedures address notification of local emergency response agencies if a release occurs. Employees receive training in emergency procedures. The emergency procedure is updated when necessary based on modifications made to the plant facilities.



The overall emergency procedure program for the Tebone Fraction
ation Plant is coordinated with the Ascension Parish Emergency Management organization (LEPC). This coordination includes periodic meetings of the committee, which includes local emergency response officials, local government officials and industry representatives. The Tebone Fractionation Plant has around-the-clock communications capability with appropriate LEPC officials and emergency response organizations (e.g., fire department). This provides a means of notifying the public of an incident, if necessary, as well as facilitating quick response to an incident.



Planned Changes to Improve Safety



The Tebone Fractionation Plant resolves all findings from PHAs, some of which result in modifications to the process. Other recommendations for possible changes to improve safety come from periodic accident prevention program audits, incident investigations, or employee suggestions and recommendations. The following changes are planned for implementation at the Tebone Fractionation Plant.



* Management is currently reviewing the results of a comprehensive facility siting blast overpressure study to determine any building modifications needed to ensure the safety of plant operating and office personnel stationed at the plant.

* Enterprise is currently in the process of reviewing and revising the entire safety management / accident prevention program to ensure that the program can be fully administered across the diverse nature of the facilities owned or operated by the company.